Hello,
I have found that most of the time when I copy a specification that the specification will get pasted in a folder that is down 1 level.
<Root Dir>
<folder Level 1>
<folder level 2>
Spec 1
Spec 2
Copy of Spec 1
Sometimes it places the copied spec at the same level, but not most of the time. I find that after I delete the incorrectly located copy, the next copy I make goes where I expect it to.
Is there a way you could make it so specs and requirements could be dragged to the correct folder, maybe re-organized them that way too? Maybe copy-paste on the specification icon?
Hmmmmmm
Take care.